{"id":2310,"date":"2017-12-04T12:17:54","date_gmt":"2017-12-04T12:17:54","guid":{"rendered":"http:\/\/euro.digiteria.ro\/?page_id=2310"},"modified":"2021-12-02T17:24:39","modified_gmt":"2021-12-02T17:24:39","slug":"news","status":"publish","type":"page","link":"https:\/\/euroconstruct98.ro\/en\/news\/","title":{"rendered":"News"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<h3>Design and build By-pass Highway Bucharest km 0 + 000-100 + 900, Lot 3: Sector 1 Km 85 + 300-100+ 765 South Road afferent; Sector 2 Km 0 + 000-2 + 500 Related to Northern Ring<\/h3>\n<p>By-pass Highway Bucharest second ring. <em><strong>Contract Value: 853 422 022.52 lei (plus VAT)<\/strong><\/em><\/p>\n<h3><\/h3>\n<h3>The regional project for the development of water and wastewater infrastructure of Ilfov County, in the period 2014-2020<\/h3>\n<p>Extension of water supply networks, sewerage networks, wastewater pumping stations in Mogo\u0219oaia, Balote\u0219ti, Tunari. <em><strong>Contract Value: 96.624.715\u00a0 lei (plus VAT)<\/strong><\/em><\/p>\n<p>Extension of water supply networks, sewerage networks, wastewater pumping stations in Bragadiru, Clinceni. <em><strong>Contract Value: 92.731.701 lei (plus VAT)<\/strong><\/em><\/p>\n<h3>Rehabilitation of the Brasov-Simeria railway line<\/h3>\n<p>Rehabilitation of the Brasov-Simeria railway line, part of the Pan European Corridor IV, for the movement of trains with a maximum speed of 160 km\/h. <em><strong>Contract Value: 2 979 386 423,41 lei (plus VAT)<\/strong><\/em><\/p>\n<h3><\/h3>\n<h3>Modernization of Piata Sudului Infrastructure<\/h3>\n<p>The largest underground road project in the south of the capital, done in the Vacaresti Street &#8211; Nitu Vasile Street direction.<\/p>\n<h3><\/h3>\n<h3>Orastie-Sibiu Motorway Inaugurated [December 2013]<\/h3>\n<p>Lots 1,2 and 4 of the Sibiu-Orastie Motorway were commissioned on December 20th 2013. We participated in this project by designing and executing Lot 4.<\/p>\n<h3><\/h3>\n<h3>Tramway Buzesti &#8211; Berzei &#8211; Uranus Completed [December 2013]<\/h3>\n<p>We ensured the rehabilitation of the tram lines for the Buzesti-Uranus-Berzei track.<\/p>\n<h3><\/h3>\n<h3>Rehabilitation of the Border-Curtici-Simeria railway line.<\/h3>\n<p>Rehabilitation of the Border-Curtici-Simeria railway line, part of the Pan European Corridor IV (Section 1: Border &#8211; Curtici &#8211; Arad- km 614)[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text] Design and build By-pass Highway Bucharest km 0 + 000-100 + 900, Lot 3: Sector 1 Km 85 + 300-100+ 765 South Road afferent; Sector 2 Km 0 + 000-2 + 500 Related to Northern Ring By-pass Highway Bucharest &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2310","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/pages\/2310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/comments?post=2310"}],"version-history":[{"count":4,"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/pages\/2310\/revisions"}],"predecessor-version":[{"id":2560,"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/pages\/2310\/revisions\/2560"}],"wp:attachment":[{"href":"https:\/\/euroconstruct98.ro\/en\/wp-json\/wp\/v2\/media?parent=2310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}