Design and build By-pass Highway Bucharest km 0 + 000-100 + 900, Lot 3: Sector 1 Km 85 + 300-100+ 765 South Road afferent; Sector 2 Km 0 + 000-2 + 500 Related to Northern Ring
By-pass Highway Bucharest second ring. Contract Value: 853 422 022.52 lei (plus VAT)
The regional project for the development of water and wastewater infrastructure of Ilfov County, in the period 2014-2020
Extension of water supply networks, sewerage networks, wastewater pumping stations in Mogoșoaia, Balotești, Tunari. Contract Value: 96.624.715 lei (plus VAT)
Extension of water supply networks, sewerage networks, wastewater pumping stations in Bragadiru, Clinceni. Contract Value: 92.731.701 lei (plus VAT)
Rehabilitation of the Brasov-Simeria railway line
Rehabilitation of the Brasov-Simeria railway line, part of the Pan European Corridor IV, for the movement of trains with a maximum speed of 160 km/h. Contract Value: 2 979 386 423,41 lei (plus VAT)
Modernization of Piata Sudului Infrastructure
The largest underground road project in the south of the capital, done in the Vacaresti Street – Nitu Vasile Street direction.
Orastie-Sibiu Motorway Inaugurated [December 2013]
Lots 1,2 and 4 of the Sibiu-Orastie Motorway were commissioned on December 20th 2013. We participated in this project by designing and executing Lot 4.
Tramway Buzesti – Berzei – Uranus Completed [December 2013]
We ensured the rehabilitation of the tram lines for the Buzesti-Uranus-Berzei track.
Rehabilitation of the Border-Curtici-Simeria railway line.
Rehabilitation of the Border-Curtici-Simeria railway line, part of the Pan European Corridor IV (Section 1: Border – Curtici – Arad- km 614)